QUALITY & DELIVERY
Inspection Reports & Protective Packaging
See how SkyPu records measurement results and prepares drawing-based precision components for shipment from Kunshan, China.
For moldmakers, OEM tooling teams and industrial buyers, the requirement continues beyond machining: parts need identifiable inspection records and protection during delivery.
Measured components
Each part is measured before packing. Reports record drawing dimensions, tolerances and actual results.
Individual protection
Parts are packed separately and labeled so different components remain identifiable.
Reports with shipments
Each shipment includes an inspection report. Confirm the required coverage and documents during your RFQ.
What our inspection report records
SkyPu’s QC report brings the part reference, specification and measured results together. The report format shown in our company materials includes upper and lower tolerances, actual measurements, inspection equipment, inspection date and checking or approval fields.
- Dimensional evidence: compare the required drawing dimension and tolerance with the recorded measurement.
- Part identification: connect the record with the appropriate order, part and drawing reference.
- Inspection review: identify the equipment, date and checking or approval information recorded for the inspection.
Identify critical dimensions, datums, units, drawing revision and any required inspection method before quotation. First-article scope, full dimensional reports and additional certificates should be agreed as part of the order requirements.
Sample inspection report
KunShan SkyPu Precision Mold Co., Ltd.
QC Inspection Report
FORMAT PREVIEW| Report item | Recorded information |
|---|---|
| Order and part | Customer, PO, part name and drawing or part reference |
| Specification | Units, material and hardness where applicable |
| Dimensions | Drawing dimension, upper tolerance and lower tolerance |
| Results | Actual measured values for the reported dimensions |
| Verification | Inspection equipment, date, checking and approval fields, and inspection judgement |
This is a readable summary of the fields in SkyPu’s anonymized report example. It is not a shipment-specific inspection certificate. Customer names, order references and part numbers are omitted from this public preview.

Protective packaging and identification
Inspect before packing
Check components and complete the required inspection record before preparing the shipment.
Pack parts separately
Use individual bags or protective wrapping to keep components separated and protect their surfaces.
Attach identification labels
Label packages so the part reference and quantity can be matched with the order and inspection documents.
Prepare the shipment
Arrange the protected parts in the shipping carton and include the inspection report. Confirm any special packaging or labeling requirements before production.
Agree the delivery requirements with your RFQ
Send the part number and drawing revision, material, quantity, critical tolerances, inspection documents and delivery destination. If your receiving process requires a particular label, report layout, packing arrangement or corrosion protection, include that requirement for review.
Transit time depends on destination, package size and weight, shipping method and customs clearance. We confirm the available shipping arrangement and commercial terms for the specific order.
Send your drawing and inspection requirements
Our team reviews the manufacturing, inspection and packaging scope before confirming the quotation.
Still preparing your drawings? Send a quick inquiry; file upload is optional in the short inquiry form.
